Blog Search

Showing posts with label slurry. Show all posts
Showing posts with label slurry. Show all posts

Thursday, September 1, 2011

Polymer Innovations In Road Stabilisation

Polymer Innovations works closely with industries especially to help them maintain safe working environments that assist with the health & safety of workers, their families & local residents. Many of these heavy industries such as mining & construction are located in remote locations & utilise dirt or unsealed private & public roads constantly.


Treated Road In A Hunter Valley Mine
Due to the huge amounts of stress these roads regularly receive they soon lose stability & erode. Spilling & leaching toxic dirt, mud & water pollution into nearby land & waterways affects employees, residents & the local environment.

Road stabilisation is important in maintaining our landscapes integrity by stopping the leaching of water based & airborne pollution, preventing hard panning & increased salt content of soils, protect native land & increase the strength of roads & embankments.

Road stabilisation, soil erosion & dust pollution problems are dealt with quickly by Polymer Innovations specific polymer products. That are easy to apply, cost effective, biodegradable, non-toxic & environmentally friendly.

Water$ave Flobind is a lineal polymer that is used for soil erosion control, road stablisation, dust suppression, dam sealing & hydroseeding. Flobind is a lineal polymer in powdered form that instead of forming a gel as most of our polymers do, Flobind turns into a slime.


Water$ave Flobind is extremely versatile & can assist with all water & pollution issues. It flocculates suspended fine soil particles & stabilises existing soil structure. Flobind is also ideal for smaller applications where powder or emulsion dosing systems are not practical.

This polymer gives us an even greater ability to customise a solution for your water & pollution problems. Whether it is used on its own or mixed with other blends our ability to cater a solution for you is assured.

Suppressing dust & light soil in the air is important in many ways. Such as keeping people & animals free from allergies & asthma, reducing soil erosion, ecological damage & airborne pollution. Also, reducing wear & tear on nearby expensive equipment.  

Finding ways to effectively control it in a simple & cost effective manner is beneficial for everyone. Polymer Innovations meets this demand with a specific & extremely cost effective polymer blend for dust pollution control Water$ave DS Dust Suppression. Local coal mines in the Hunter Valley with serious dust concerns use Water$ave DS Dust Suppression on a regular basis.

Before W$DS & ....After W$DS
Water$ave Dust Suppression is an effective dust stabilising agent for soil waste & mineral dumps; civil & commercial construction sites; open cut & underground mines; coal stock pile management; quarries & landfills; unpaved roads; parking lots & open areas; dirt roads; airstrips & other dust prone areas.

Water$ave DS offers a quick, safe & cost effective solution that reduces the amount & the frequency of cart watering. No matter the scale Polymer Innovations staff will provide the best dust suppressant solution to keep your environment clear & it's inhabitants breathing easier.

Polymer Innovations develops specific polymer blends that address the unique requirements of industries exposed to hazardous or toxic slimes & sludges. Our SAP Range (Super Absorbent Polymers) absorb large quantities of toxins in water & hold them stable for removal for mining, construction & governments roadways; dredging & other industrial waste water affected areas.

Toxic water ingress issues are dealt with quickly by our SAP polymer blends. SAP reduces damage to the surrounding environment & removes hazardous material from the work area that can be caused by toxic water & mud slurries. This ability to cater to the unique requirements of our clients allows us to control toxic water based pollution from some of Australia's most pristine environments & productive industries.

SAP Testing
Depending on the type of polymer used & it's blend ratio; the toxic sludge can retain a certain amount of moisture when the water is absorbed holding the slurry or slime stable. This is important to keep the integrity of the mixture so it holds together while it is being handled & moved.

Polymer Innovations are specialists in striking the perfect balance of sludge & moisture required to reduce the weight added by the polymer while maintaining it's structural integrity. Toxic water slurries that are too thick to pump or too watery to shovel up, can be thickened quickly by adding SAP HD & HPF allowing for fast & easy removal.

Hydroseeding is used to seed grass on commercial sites, highways or motorways, parks & golf courses, heavily damaged or burnt land, lawns & areas too large, inaccessible or unsuitable for conventional methods. Once it is applied to the soil, it enhances growth by providing an ideal environment for seed germination.

Water$ave HY Hydro can be efficiently applied for hydroseeding operations in mountainous areas or road embankments. Maximising plant establishment & holds the components together preventing loss of material through wind & water erosion.

Water$ave HY Hydro prevents cellulose mulch from becoming hardpan during a dry spell. The mulch remains aerated allowing the seeds to sprout quickly. Water$ave HY also reduces the amount of mulch needed. Polymer Innovations Water$ave HY Hydro is highly effective in the young regrowth of trees, shrubs, bushes & saplings to assist in revegetation & reforestation.
Deforestation of native vegetation creates many problems such as soil erosion or air pollution. Ecological destruction effects all animal & plant species which then contributes to disease, food shortages & an imbalance in ecosystems that we share.

W$PT Perfect For Native Saplings
Polymer Innovations Water$avePT Plantation is effective in the revegetation & reforestation of roadside trees, bushes, tube stock & saplings.

Water$ave PT reduces the mortality rate caused by transplant shock & also enhances root development, encouraging more rapid growth & production.

Water$ave PT reduces the leaching of any introduced fertilizer, minimising evaporation from the soil whilst improving porosity & aeration. It is a specific blend of anionic cross-linked & lineal polymers that can be added either in wet hydrated or dry form to the planting hole.

Benefits to industries & individuals that use our unique polymer blends: 

  • Easy & safe to handle. 
  • Protect the environment against drought & groundwater pollution. 
  • Rapidly dissolves in water without gel blocking.
  • Same methods no matter the scale.
  • Maintain landscape integrity, prevent hardpanning & reduce soil salt content.
  • Dust exposure for humans & animals is quickly & accurately reduced.
  • Improves soil infiltration & light soil control.
  • Protect native land & increase the strength of roads & embankments.
  • Cost effective, no need for heavy & expensive earth moving equipment.
  • Proven time & equipment saver.
  • Non toxic, biodegradable & environmentally friendly. 
  • Full documentation & backup support.

Polymer Innovations sales & support staff will tailor the best solution for your road stabilisation projects.

Wednesday, November 3, 2010

Submit Your Dam Details!

Polymer Innovations has many effective & popular greentech polymers to save water & control pollution.

Our Water$ave Plug range is our most popular product, it is the world champion in polymer dam sealants.
It is cost effective, simple & customisable to your soil types & dam structures.

Water$ave PL Plug
When addressing clients dam leak issues either online, in person or over the phone, we need to gather critical background information.

Critical information such as soil type, dam size, shape, age, history, location & rate of leak helps us to address your unique problems quickly & accurately.

One of our most effective methods is via our Customer Dam Form on our website.

A fully functioning version of this form is embed below.

If your dam, pond or canal is leaking.
Please fill out the form below & press submit. We will reply to your submission as soon as possible, usually within 2 business days.

Thursday, September 16, 2010

Polymer Innovations To Help Detox Sydney Harbour

Australia's Sydney Harbour is arguably the most beautiful harbour in the world but lurking beneath it's shiny blue surface is a very dark & toxic secret indeed.

In January 2006, NSW Health surprised many Sydneysiders when they issued an advisory telling people not to consume seafood caught from Sydney Harbour due to high levels of Dioxin found in marine life living in Port Jackson estuaries & harbour.


As a result commercial fishing in Sydney Harbour was banned in February 2006.
Some fisherman were concerned about their own Dioxin levels so testing of Serum Dioxin levels was offered to commercial fishers & their families.
It was found that Serum Dioxin levels in these fisherman were higher than Australian background levels, but comparable with other international high fish-eating communities.

Recreational fishing is still allowed but only a certain amount of seafood can be consumed.
As a precautionary measure people are advised to eat only one 150gm serve of fish caught from Sydney Harbour per month. This quantity is based on a 70kg adult.

Dioxins are a group of chlorinated chemicals that originate from industrial pollution or are generated in natural processes such as bush fires. Dioxins are chemically stable & stay in the environment for a long time which accumulate in the body fat of animals & humans.

Now in 2010 levels are higher & the mud that sits at the bottom of this harbour has transformed into an anoxic (no oxygen present) sludge that has killed off 40% of the harbour's invertebrates!

This lifeless sludge contains high levels of organochlorine pesticides like DDT, heavy metals like lead & the highest concentrations of toxic hydrocarbons to be found anywhere in the country.

The industrial dumping of toxins has been banned for decades but these toxic hydrocarbons still enter the harbour via Sydney's storm water system into it's estuaries that continuously move these toxic clusters about the harbour.

Hydrocarbons are an organic compound consisting entirely of hydrogen & carbon. A common example of a hydrocarbon is crude oil. So this sludge is like toxic crude oil!


In June, the ABC's Catalyst program ran a very informative story regarding these toxic sediment concerns in Sydney harbour.
This program can be viewed here: http://www.abc.net.au/catalyst/stories/2917562.htm

Polymer Innovations was approached about this problem in the harbour & were asked to make a submission to the contractors working for the NSW government with a number of other competing firms.

Depending on the type of polymer used & it's blend ratio; the toxic sludge will still retain a certain amount of moisture turning from a glossy consistency to a a matte consistency when the water is absorbed & held stable.

This is important to keep the integrity of the mixture so it holds together while it is being handled & moved.
The perfect balance of sludge & moisture is required to reduce the weight added by the polymer while maintaining it's structural integrity.

 The above photo stream shows some tests & initial application of these experimental SAP blends.

There are a number of parameters that this unique reclamation project presented:
  • All work is to be done offshore.
  • Suitable for long haul transportation to Queensland.
  • Eliminate double handling of sludge.
  • Minimisation of active ingredient to reduce weight & costs.
  • Reduce heavy machinery use.
These parameters were addressed by our new unique SAP blend:
  • The polymer is packaged & applied easily in 500kg - 1000kg bulk bags. So it can be mechanically added to the sludge in any location or conditions.
  • When applying the polymer at the correct blend ratio, the sludge will hold firm enough to 'stand' for long haul transportation to Queensland.
  • Once the polymer is applied to the sludge it can be loaded directly to awaiting transportation if required.
  • This polymer has reduced the active ingredient down to 2.5% of the load. Current methods & those of our competitors add 50% to the load! It is estimated that this will reduce weight & costs by at least 50%.
  • Due to the increased structural integrity of the sludge, lighter or more specific machinery can be used. In fact it can be loaded manually ie. spadable.

Utilising a SAP:
  • Reduces hazardous spillage, CO2 & pollution emissions, 
  • Reduces man hours, extra handling activity & traffic on roads. 
  • Improves safety & efficiency for the dredging contractors. 
  • Direct improvements to the environment of Sydney Harbour's wildlife & it's citizens.

Recently, Polymer Innovations developed a specific new blend of super absorbent polymer based on our HPF blend to tackle large amounts of watery toxic sludge from local mines in the Hunter.

This new blend named 'P4' was trialled by us along with other blends to come up with the best solution for extracting, loading & transporting this toxic sludge from Sydney harbour.

Polymer Innovations SAP HPF P4 contains very small polymers for an accurate application to the targeted area, for a more effective removal of water affected slimes & slurries.
HPF P4 is particularly well suited for dredging work.

Polymer Innovations sales & support staff will tailor the best solution for the removal of dangerous mud, slimes, slurry or sludge.

Our SAP HPF range available online.
More information regarding our SAP range is available from previous blog posts here.

For a copy of this SAP HD & HPF information please View/Download Catalogue.

Call to order/inquire on: +612 65 715 177 or email: info@polymerinnovations.com.au so we can help you manage these problems for you ASAP!

Thursday, May 27, 2010

Water$ave HY Hydro

In the modern age we are sometimes to impatient to wait for mother nature & father time to do things in their own way. Sometimes to catch up with our often increasing rate of damage is to increase the rate of the recovery.

Experiments throughout history to make nature more 'efficient' may not always work but in the case of early hydroseeding trials in the United States during the 1950's the first 'Hydroseeder' was a resounding success.

The first commercial hydroseeder was invented to efficiently shoot seed & fertiliser over broad areas. This process is now used throughout the world.

Hydroseeding (or hydro-mulching) is a planting process which utilises a slurry of seed & mulch. The slurry is transported in a tank, either truck or trailer mounted & sprayed over prepared ground in a uniform layer.
Helicopters may be used in cases where larger areas must be covered. Aircraft application may also be used on burnt wilderness areas after a fire, & in such uses may contain a soil stabiliser only to avoid introducing non-native plant species.

Hydroseeding is an alternative to the traditional process of broadcasting or sowing dry seed.
It promotes quick germination & inhibits soil erosion.

The mulch in the hydroseed mixture helps maintain the moisture level of the seedlings.
The slurry often has other ingredients including fertilizer, tackifying agents, green or blue dye & other additives.

Hydroseeding is used to seed grass on commercial sites, highways or motorways, parks & golf courses, heavily damaged or burnt land, lawns & areas too large, inaccessible or unsuitable for conventional methods.

Once it is applied to the soil, it enhances growth by providing an ideal environment for seed germination.

Starting a lawn by hydroseeding is considerably cheaper than laying sod/turf & quicker than using seed.
It is also used to spread mixtures of wildflower & tree/shrub seeds or turf grasses for erosion control.
This is called sprigging (or hydrosprigging) when the slurry contains stolons or rhizomes instead of seed.


Water$ave HY Hydro is a blend of Water$ave & Flobind that can be efficiently applied for hydroseeding operations in mountainous areas or road embankments. Flobind maximises plant establishment & holds the components together preventing loss of material through wind & water erosion.

Water$ave HY Hydro prevents cellulose mulch from becoming hardpan during a dry spell. The mulch remains aerated allowing the seeds to sprout quickly. Water$ave HY also reduces the amount of mulch needed.

Water$ave HY Hydro's main benefits include:
  • Enhances plant seeding, growth & survival.
  • Increase the water holding capacity of soils.
  • Reduce watering frequency by up to 50%.
  • Protect the environment against drought & groundwater pollution.
  • Improve physical properties of compact soil.
  • Reduce water evaporation from soil.
  • Limit leaching of nutrients & fertilizers.
  • Improves soil porosity & aeration that stimulates plant growth.
  • Non toxic, environmentally friendly & biodegradable.
Polymer Innovations Water$ave HY Hydro is highly effective in the young regrowth of trees, shrubs, bushes & saplings to assist in revegetation & reforestation.

Water$ave HY application information:
  • 1 to 2 kg of fine textured Water$ave HY per cubic metre of water along with mulching materials, fixing agents, seeds & fertilizers. 
  • Depending upon water retention desired, soil retention desired, soil type and salt content of the water, one hectare of hydro seed will only require 10-20kg of polymer. 
  • Water$ave HY must be added last to the hydro seeder tank after the other components. 
  • Stir at least 15 minutes before spreading.
  • Water$ave HY is available in easy to use 20kg pails.
 Water$ave HY will reduce the time it takes the native vegetation to reclaim it's environment.

Polymer Innovations sales & support staff will tailor the best solution for your hydroseeding, hydromulching, hydrosprigging & other young regrowth concerns.

Our Water$ave HY Hydro range is not currently available online, yet.
For a copy of this Water$ave HY information please View/Download Catalogue.

Call to order/inquire on: +612 65 715 177 or email: info@polymerinnovations.com.au so we can help you manage these problems for you ASAP!

Water$ave HY provides an efficient, safe & easy to apply solution to enhance the fast growth of cleared or damaged native land.

Wednesday, May 12, 2010

Polymer Solutions For Coal Mine Pollution

Coal mines have been in the news a little more than usual of late & it has not been all good news. Serious questions have arisen globally about coal industries especially concerning duty of care towards it workers & the quality of life for those that live nearby. Who are quite often the families, friends & workers of supporting industries of these coal mines.

Recently the US government has announced that will be increasing restrictions on businesses that pollute water affected by mountaintop removal mining. This involves exploding coal seams from the side of mountains which eventually sends very hazardous & often radioactive toxins such as lead, arsenic & selenium into nearby rivers & streams.

This was somewhat in response to a disaster on December 22nd 2008 at the TVA Kingston's coal fired power plant in Tennessee which created the worlds largest coal sludge disaster. Over a billion gallons of this coal sludge destroyed nearby homes, lands & rivers.

From CNN:
"The sludge, a byproduct of the ash from coal combustion, was contained at a retention site at the Tennessee Valley Authority's power plant in Kingston, about 40 miles west of Knoxville.
The retention wall breached early Monday, sending the sludge downhill and damaging 15 homes. All the residents were evacuated, & three homes were deemed uninhabitable, according to the TVA."


Meanwhile in China coal mining is the deadliest occupation where thousands of people die annually either directly from pit disasters or indirectly from airborne pollution from coal mines or coal fired power stations.
The latest tragedy occurred in the northern China province of Shanxi only a month ago.

From NY Times:
"Investigators blamed the usual culprit in China’s regular mine accidents: a lack of safety precautions. For days before the mine flooded, managers ignored water leaks that presaged trouble, according to preliminary findings by the State Administration of Work Safety. Miners had been ordered to step up the pace of construction to meet an October deadline to begin production at the mine, the agency said.
Of the 261 miners underground that day, 108 made it to safety. The rest were trapped & feared dead.


However, the most recent mining tragedy is currently being uncovered on our turf in Australia's Hunter Valley. This tragedy is far less obvious but potentially just as deadly in the long term.

For the past twenty years the Hunter Valley has seen more & more mines being approved many of them open cut coal mining that readily creates airborne pollution across nearby areas.

Below: Satellite photo of the Hunter Valley. The grey areas are mines.

On 12th of April Singleton became embroiled in a 'cancer cluster' story that was aired by he ABC's 4 Corners program that links a predominance of cancer, asthma & allergies in the area to the large amounts of coal dust that comes from local mines & power stations.

A link to this story including a full version of the program & many more details can be found here: http://www.abc.net.au/4corners/content/2010/s2867659.htm

From ABC News:
"People who live in Singleton and Muswellbrook and the towns in between have told Four Corners that the pollution coming out of nearby mines and power stations is making them sick with cancer and asthma.
Local GP Tuan Au tested 900 local school children and found one in six students had a lower lung function. The national average for asthma is one in nine.
His report was dismissed by New South Wales Health Minister Carmel Tebbutt.
Dr Au says that is not good enough and he has called for more to be done.
"What I'm going to do, is do it again until the Government will listen to it, and I will let the history be the judge," he said. "If we ignore the problems and we do nothing about it's the same as murder."

One month later:

"Fears of high rates of childhood asthma in the resource rich Hunter/New England Region have been confirmed in the New South Wales Government's new child health report.
The report found nearly 40 per cent of 9 to 15-years-olds in the region had suffered from asthma at some stage. That is 17 per cent more than the central coast. The region also has the highest asthma rate for children under eight, with just over a quarter needing treatment.
There have been ongoing calls for a comprehensive health study in the Upper Hunter, due to concerns about asthma being linked to the coal and power sectors.
Health officials have previously acknowledged above-average levels of asthma and respiratory problems in the area."

Polymer Innovations is located at Singleton in the heart & lungs of the Hunter Valley. 
We feel it is our duty to maintain our commitment to offering local, national & global mines products that can solve or at least abate these coal mine pollution problems.

There are 3 specific Polymer Innovation products that assist in controlling coal mine pollution.

1. Polymer Innovations SAP HPF (High Performance Fines) & HD (Heavy Duty)
absorbs large quantities of water present in mining, construction, roadways & other water affected areas.
Muddy water that is too thick to pump or too watery to shovel up, can be thickened or solidified quickly by adding SAP HD & HPF allowing for fast & easy removal.


In mining SAP HPF & HD is designed for critical applications where production is affected by water based slurries. Recovered waste can be transported to the surface on conveyors without extended periods of downtime or reduction in productivity.

SAP HPF contains smaller polymers for quick, targeted removals of water ingress.
SAP HD is generally more suited for larger scale instances of sludge to be removed.
However varying conditions occur all the time & the correct SAP for each customer is determined on a case by case basis.
Much more information on our SAP Products can be found in a previous blog post Super Absorbent Polymers SAP HD & HPF.

Our SAP range is not available online, yet.
For a copy of this SAP information please View/Download our SAP Catalogue.
 
2. Polymer Innovations Water$ave DS Dust Suppression is especially important in heavy industry that resides in open environments such as mines, roads & airstrips or construction sites that pollute the air & blow it elsewhere.
Finding ways to effectively control it in a simple & cost effective manner is beneficial for everyone. 

Polymer Innovations has met this demand with it's own specific blend for dust control Water$ave DS.
Water$ave DS
has become a simple, proven, economic & environmentally friendly solution to control dust & light soil erosion. 

Local coal mines in the Hunter Valley with serious dust concerns use DS on a consistent basis.
No matter the scale Polymer Innovations provides the dust suppressant solution to keep your environment clear & it's inhabitants breathing easier.

More Information on our Water$ave DS Products can be found in a previous blog post Water$ave DS Dust Suppression. 
Or download or view the Water$ave DS Catalogue for more information.

Water$ave DS (Dust Suppression) is available in 20kg pails at our Online Store & we service worldwide.

3. Polymer Innovations Water$ave RS Road Stabilisation
is an oil based product that is the key element of a road stabilization system. It eliminates dust, costly watering & maintenance procedures.


Water$ave RS is applied as a neat liquid once or twice a year to provide efficient dust control on haul roads, access roads & similar heavy traffic areas.

Water$ave RS is extremely effective as a stabilising agent for waste & mineral dumps, rural airstrips & other dust prone road surfaces.

  • This is a proven, economic & environmentally friendly solution for road stabilisation.
  • Binds soil particles to provide a firm hard surface.
  • Surface has excellent traction in wet & dry conditions.
  • Water is not required during application.
  • Only need to apply once or twice a year.
  • Easy and safe to use.
  • Reduces time and expenditure on road maintenance.
  • Increases the bearing capacity of existing road material.
  • Consolidate & improve the quality of existing road materials.
  • Significantly cuts dust exposure.
Our Water$ave RS range is not available online, yet.
For more information please View/Download our Water$ave RS Catalogue.

For all enquiries & orders call Polymer Innovations on: +612 65 715 177 or email: mining@polymerinnovations.com.au so we can help you solve these coal pollution problems for you A-SAP!

Thursday, January 28, 2010

Super Absorbent Polymers HPF & HD

Mining & construction can be a dirty, wet & hazardous business at the best of times. So the control of water affected areas by mud or slurry is paramount in maintaining the safety & efficiency of any project that is compromised by the presence of that water.

Polymer Innovations has met this challenge for Australia's most productive mines especially in the Hunter Valley by developing a specific SAP (Super Absorbent Polymer) range of products.

Construction & mining water ingress issues are dealt with quickly by Polymer Innovations Super Absorbent Polymers.

Our SAP range reduces damage to the surrounding environment & removes hazardous material from the work area that can be caused by mud, coal slurry or coal sludge.



SAP HPF (High Performance Fines) & HD (Heavy Duty) absorbs large quantities of water present in mining, construction, roadways & other water affected areas. Muddy water that is too thick to pump or too watery to shovel up, can be thickened or solidified quickly by adding SAP HD & HPF allowing for fast & easy removal.

In mining SAP HPF & HD is designed for critical applications where production is affected by water based slurries. Recovered waste can be transported to the surface on conveyors without extended periods of downtime or reduction in productivity.

SAP HPF contains smaller polymers for quick, targeted removals of water ingress.
SAP HD is generally more suited for larger scale instances of sludge to be removed.
However varying conditions occur all the time & the correct SAP for each customer is determined on a case by case basis.


Advantages of using a SAP product include:
  • Recover water affected areas & roadways immediately.
  • Reclaim sumps & slimes quickly.
  • Reduce downtime.
  • Clean up road slurry.
  • Locate water ingress problems efficiently.
  • Proven time & equipment saver.
  • Easy & safe to handle.
  • Super quick application time.
  • No airborne dust generated.
  • No mess, no worries.
  • Available in bulk bags or easy to pour pails.
Polymer Innovations sales & support staff will tailor the best solution for your water ingress problems.

Call to order/inquire on: +612 65 715 177 or email: mining@polymerinnovations.com.au so we can help you manage these problems for you A-SAP!


Our SAP range is not available online.
For a copy of this SAP information please View/Download our PDF Catalogue.
 
SAP PACKAGING DETAILS:
SAP HD 17kg Pails 32 per pallet
SAP HD 17kg Pails 48 per pallet
SAP HD (BULK) 1000kg Bulk Bag
SAP HPF 18kg Pails 32 per pallet
SAP HPF 18kg Pails 48 per pallet
SAP HPF (BULK) 500kg Bulk Bag

GENERAL APPLICATION RATE INFORMATION
Smaller Scale: Pails
  1. Easy Pour Pails: Designed for application directly into affected area. 
  2. 1-2kg SAP per m³ of slurry/mud.
  3. Calculate volume of affected area to determine quantity of product required.
  4. Remove lid from pail or drum and discharge into several accessible areas keeping upwind of discharge point and as close to the slurry as practicable.
  5. Mix SAP through water affected area.
  6. Push solidified spoil into affected area that still requires treatment then mix in evenly
  7. Remove waste using loader or shovel.
Larger Scale In Mining: Bulk Bags
  1. Application as above.
  2. Requires at least 2 people & a loader or pump.
  3. Reclaim waste using loader & dump on conveyor belt or into cut through.


SAP HPF & HD provides an efficient, safe & easy to apply solution to any water based problem where hard to handle water or mud needs to be removed.